- 1125 Russel St
- 1125 - 4 weeks

- 1125 - 2 weeks

  • $0.00

Monday - March 16th
- Prepped rooms
- knockdown on ceiling done
- took doors off all rooms
- partial cabinets removed.
- removed all nails and screws

Tuesday - March 17th
- Insulated all outside wall outlets,
- Cleaned some walls (TSP)
- Spray foamed Filled and 1st drywall coat on holes
- Touched up ceilings where scrapped.
- Removed bathroom vanities
- Back door floor is wet and will need fixing.  10" x 5 feet
- Scrap stored in shed until removal time

Wednesday - March 18th
- Fix master bath Floor
- Clean walls (TSP)
- Prep Windows, tape and mask

Thursday
- March 19th
- Clean walls (TSP)
- Drywall repairs

Friday - March 20th
- Took more trim off in bathroom and kitchen
- Removed carpet and padding
- Cleaned up and stored scrap in shed
- Prep n Filled some nail holes
- Brad nailed a few things, and taped other areas needed nailed (alot of loose trim)

Saturday - March 21st
- Remove main sink and counter
- Remove carpet tack strips in main room
- Pulled up staples / Prepped main room
- clean and put trash in shed

Monday - March 23rd
- Remove carpet tack strips
- 2 Trips to the landfill
- Pull up/hammer down staples / Prep All bedrooms 

Tuesday - March 24th
- took off seams and taped (2nd coat on, 2 more to add)
- Finished hallway
- Drywall seams in kitchen

- added backer plate for door trims

Wednesday - March 25th
- 3rd coat drywall mud

Thursday - off

Friday - March 27th
- 4th coat on seams
- brad nailed some trim
- unloaded truck
- Plastic paint protection over plumbing
- all doors in shed till cabinets in

Write a review

Note: HTML is not translated!
    Bad           Good
  • Product Code: 1125-1
  • Availability: Pre-Order
Best
Patch
Eco
100
Good Fuel Patches
Bad Fuel Patches
Sky Lantern Sales | 4370 Chicago Dr. | Grandville, MI 49418 | U.S.A. | (616)-667-1090